ABOUT US
Mission and Culture
Team
GIBB Worldwide
Quality Policy & Certifications
MARKET SECTORS
SERVICES
PORTFOLIO
CONTACTS
ABOUT US
Mission and Culture
Team
GIBB Worldwide
Quality Policy & Certifications
MARKET SECTORS
SERVICES
PORTFOLIO
CONTACTS
ALL
ENVIRONMENT
HYDRAULIC AND WATER RESOURCES DESIGN
PROJECT AND CONSTRUCTION MANAGEMENT
TRANSPORT INFRASTRUCTURES DESIGN
Design Development for Drainage System Refurbishment of Docks 9 & 10 of Beira Port, Mozambique
2018
Tanafnit- El Borj Hydroelectric Power Plants – Khenifra Province, Morroco
2010
Portela Lagoon Construction – Madeira Island, Portugal
2009
Lamego Hydroelectric Power Station, Portugal
2010
Caneiro Hydroelectric Power Station, Portugal
2011
Operation Strategy Study and Definition for Mitigation of Potential Risks of Collapse at Kariba Dam – Report for Cahora Bassa Dam Administration, Mozambique
2015
Master Plan for Conception of the “Multi-Municipality” Water Supply and Sanitation Systems of North, Center and South of the Country, Portugal
2008
Execution Design for Drinking Water Supply System to Beni Ourtilane – Guenzet Territory from Tichy Haf Dam, Algeria
2012
Water Supply System for Sabugal System (Production & Transport Increase), Central Inland, Portugal
2010
Water Supply Sub System for Chamusca/Vale Cavalos/Ulme – Central Region, Portugal
2012
Newer
1
2
3
Older