Execution Design for Water Supply to Beja and Preliminary Design for Alternative Solutions of Irrigation Blocks Associated Accesses, Irrigation and Drainage Systems – Alentejo Region, Portugal

2009

portfolio - Projecto de Execução da Adução Pisão - Beja e dos Estudos Prévios das Alternativas de Rega, Drenagem e Viária dos Blocos de Rega Associados

Client: EDIA – Empresa Desenvolvimento Infra estruturas do Alqueva

Location: Beja, Portugal

Description:

  • Primary Net “Pisao Dam to Beja”, w/ 16Km Pipe Line, Pumping Station of 4.500 MW in Álamo, Underground Tanks in Álamo and Beringel ( 27.000m3 and 100.000m3) and “Cinco Reis” Earthen Dam, 20m High and a 116ha Reservoir with 3,75hm3 Volume.