Operation Strategy Study and Definition for Mitigation of Potential Risks of Collapse at Kariba Dam – Report for Cahora Bassa Dam Administration, Mozambique

2015

portfolio - Realização da Estratégia de Mitigação dos Potenciais Riscos de Colapso da Barragem de Kariba

Client: HCB – Hidroeléctrica de Cahora Bassa

Location: Songo, Mozambique

Description:

  • The main purpose of this study was the simulation of a Collapse Scenario at Kariba Hydro-Electric and its consequences downstream Zambezi River, proposing to Administration an Operation Strategy and Engineering Preventive Measures