Design Development for Drainage System Refurbishment of Docks 9 & 10 of Beira Port, Mozambique

2018

Client: Cornelder de Moçambique S.A.

Location: Beira – Mozambique

Description:

  • Hydrological and Geotechnical Studies;
  • Conceptual and Detailed Design of New Drainage System;
  • Detailed Design of the Pumping Station.