Execution Design for Drinking Water Supply System to Beni Ourtilane – Guenzet Territory from Tichy Haf Dam, Algeria
2012
Client: Algérienne des Eaux (ADE)
Location: Sétif and Bord Bou-Arréridje, Algeria
Description:
- Preliminary Studies and Detailed Design for supplying 14 Counties – 234.100 Population, including Intake, Water Treatment Plant for 80.000m3/day, a 134,5 Km Pipe Line with 160 to 1000mm Diameter, 11 Reservoirs and 18 Pumping Stations