• ABOUT US
    • Mission and Culture
    • Team
    • GIBB Worldwide
    • Quality Policy & Certifications
  • MARKET SECTORS
  • SERVICES
GIBB Engineering
  • PORTFOLIO
  • CONTACTS
  • Português
  • English
  • ABOUT US
    • Mission and Culture
    • Team
    • GIBB Worldwide
    • Quality Policy & Certifications
  • MARKET SECTORS
  • SERVICES
  • PORTFOLIO
  • CONTACTS
  • Português
  • English
  • ALL
  • ENVIRONMENT
  • HYDRAULIC AND WATER RESOURCES DESIGN
  • PROJECT AND CONSTRUCTION MANAGEMENT
  • TRANSPORT INFRASTRUCTURES DESIGN
  • Execução do Projecto de Recuperação e Renovação do Sistema de Drenagem dos Cais 9 e 10 no Porto da Beira – Moçambique_4
    Design Development for Drainage System Refurbishment of Docks 9 & 10 of Beira Port, Mozambique

    2018

  • portfolio - Empreendimento Hidroeléctrico de Tanafnit – El Borj
    Tanafnit- El Borj Hydroelectric Power Plants – Khenifra Province, Morroco

    2010

  • portfolio - Projecto de Execução da Lagoa da Portela
    Portela Lagoon Construction – Madeira Island, Portugal

    2009

  • portfolio - Aproveitamento Hidroeléctrico de Lamego
    Lamego Hydroelectric Power Station, Portugal

    2010

  • portfolio - Aproveitamento Hidroeléctrico do Caneiro
    Caneiro Hydroelectric Power Station, Portugal

    2011

  • portfolio - Realização da Estratégia de Mitigação dos Potenciais Riscos de Colapso da Barragem de Kariba
    Operation Strategy Study and Definition for Mitigation of Potential Risks of Collapse at Kariba Dam – Report for Cahora Bassa Dam Administration, Mozambique

    2015

  • GIBB Engineering_Logo
    Master Plan for Conception of the “Multi-Municipality” Water Supply and Sanitation Systems of North, Center and South of the Country, Portugal

    2008

  • portfolio - Projecto de Execução de Abastecimento de Água Potável aos Centros de Beni Ourtilane - Guenzet a partir da Barragem de Tichy Haf
    Execution Design for Drinking Water Supply System to Beni Ourtilane – Guenzet Territory from Tichy Haf Dam, Algeria

    2012

  • portfolio - Estudo de Concepção Geral para a Melhoria do Sistema de Abastecimento de Água do Sabugal (Aumento de Produção e de Transporte)
    Water Supply System for Sabugal System (Production & Transport Increase), Central Inland, Portugal

    2010

  • portfolio - Subsistema de Abastecimento de Chamusca-Vale de Cavalos e Ulme
    Water Supply Sub System for Chamusca/Vale Cavalos/Ulme – Central Region, Portugal

    2012

Newer
123
Older
  • MARKET SECTORS
  • SERVICES
  • PORTFOLIO
  • CONTACTS
Copyright ©2018 GIBB Portugal, SA All Rights Reserved.